New Machine For Small Business Interlocking Cement Brick Machine

New Machine For Small Business Interlocking Cement Brick Machine

These three extrusion methods are based on the difference in the moisture content of the molding.When the moisture content more than 16%,wet billet molding is plastic extrusion molding. When the moisture content equals 14-16%, it’s semi-hard plastic extrusion molding. When the moisture content equals 12-14% ,it’s hard plastic extrusion molding.Blank forming includes: feeding material , mixing,adding water and grinding equipment processing before raw materials entering the molding shop not brick extruding machine.After passing through the molding brick machine, the qualified mud and wet billet are formed.Forming process should fulfill the requirement of the shape and structure.Forming is the foundation of the brick making process.The quality of the formed body is directly related to the appearance quality of the finished tile.

After the wet billets formed from the molding plant, they need to be dried by dehydration.In the production process of sintered bricks, there are two ways of drying wet blank: natural drying and artificial drying.

New Machine For Small Business Interlocking Cement Brick Machine

 1: Investigate the market and confirm the demand

To determine new plant production scale should refer to the local market conditions.First of all, we shall thoroughly investigate local brick and tile market conditions and grasp following situation:current market demand,actual production volume of existing companies, how big the market gap is,current selling price of brick and tile products and the demand and price trend.Besides,is there the same new brick factory to be built?What is the production scale?After mastering above conditions, the new plant can be determined.

New Machine For Small Business Interlocking Cement Brick Machine

4: Infrastructure construction

After determining production scale, it is possible to determine area, process direction, equipment layout of production plant and the location of living area according to the size of production volume.Plan plant elevation based on local geological, hydrological and meteorological conditions.]Arrange various production workshops according to the wind direction.To determine the mode of production, shall it be labor-intensive companies or technology-intensive enterprises,requires whole careful plan and design by technicians based on the results of technical and economic analysis.

Welcome To Our Company Hope We Can Have A Good Cooperation.