Qt8-15 Full Automatic Cement Hollow Block Machine Production Line Concrete Paver Machine

Qt8-15 Full Automatic Cement Hollow Block Machine Production Line Concrete Paver Machine

The production process of sintered bricks is generally composed of four parts: raw material preparation, blank body forming, wet blank drying, and finished product firing.After raw materials are excavated, some can be processed by adding water, stirring and grinding equipment,while others will not work.Raw materials,such as mountain soil, coal gangue and shale,are to be broken and finely chopped, then followed by water mixing and grinding.The choice and preparation of raw materials directly affect the quality of the finished product.As the saying goes, raw materials are fundamental to making sintered bricks,showing the importance of the raw materials preparation and raw materials.

Qt8-15 Full Automatic Cement Hollow Block Machine Production Line Concrete Paver Machine

Compared with compact double stage vacuum extruder, it has more vacuum pressure, with less adobe moisture, perfect for hollow bricks production,but with higher electricity consumption due to working with two motors.

Qt8-15 Full Automatic Cement Hollow Block Machine Production Line Concrete Paver Machine

Advantage of Split Double stage vacuum extruder:

1.Strong applicability,higher capacity,lower forming brick moisture content;

2.The raw material for making bricks can be clay,coal gangue,shale powder;

3.It can produce solid,multi-holes and hollow bricks.

Welcome To Our Company Hope We Can Have A Good Cooperation.